


Resorts World Sentosa
- Project
- RWS Festive Walk Canopy
- Client
- Vector Foiltec Pte Ltd
- Year
- 2024
Painting of the steel canopy structure by rope access teams, plus night-shift painting of theme park ride structures.
More than 56 projects since 2021, for power stations, Jurong Island plants, Sentosa landmarks, hotels and condominiums.



Painting of the steel canopy structure by rope access teams, plus night-shift painting of theme park ride structures.



Coating of fire water tanks and piping with DFT checks, transformer wall painting, and fuel gas piping painting.



Power tool cleaning, primer and two finishing coats on roof top steel I-beams, by rope access. Exterior renovation of the building.



Cold box tower painting by rope access at Linde, and admin building roof waterproofing at Afton.



Full façade repainting by rope access at The Interlace, plus The Vesta, Beaverton Court, Eight Courtyards, The Blossomvale, The Vision, The Sunny Spring, Palm Gardens, The Amery, Chapel Court and more.



Exterior repair and redecoration, beach club repainting and warehouse building painting.



Hull repainting by rope access at the quayside, and interior coating of tall steel stacks.
Main contractor or direct client shown for each job.
| No. | Project | Scope of work | Client / main contractor | Year |
|---|---|---|---|---|
| 56 | City Gas | Sub-station roofing waterproofing | City Energy Pte Ltd | 2026 – ongoing |
| 55 | P&G Innovation Centre | Roof top metal structure painting | GoldWind Services Pte Ltd | 2026 – ongoing |
| 54 | City Gas | Production building & gas compressor building | City Energy Pte Ltd | 2026 |
| 53 | City Gas | Guard house painting | City Energy Pte Ltd | 2026 |
| 52 | Senoko Energy | Painting works | Senoko Energy Pte Ltd | 2026 – ongoing |
| 51 | Senoko Energy | Painting works | Senoko Energy Pte Ltd | 2026 |
| 50 | The Woods | Cluster houses basement car park floor coating | HB Resources Pte Ltd | 2026 |
| 49 | PacificLight Power | CW intake casings & ECP tank structure painting | PacificLight Power Pte Ltd | 2026 |
| 48 | P&G Innovation Centre | Exterior renovation | GoldWind Services Pte Ltd | 2026 |
| 47 | City Energy | Water seal gas holder tanks No. 1 & 2 roof plates painting | City Energy Pte Ltd | 2026 |
| 46 | PacificLight Power | Floating storage tank fire water line & stairways painting | PacificLight Power Pte Ltd | 2026 |
| 45 | Senoko Energy | Painting works | Senoko Energy Pte Ltd | 2026 |
| 44 | Senoko Energy | Painting works | Senoko Energy Pte Ltd | 2026 |
| 43 | YTL PowerSeraya | CCP5 construction, stack interior painting | Sinotcc (Singapore) Pte Ltd | 2026 |
| 42 | The Woods | Cluster houses repair & redecoration | HB Resources Pte Ltd | 2025 |
| 41 | Senoko Energy | Painting works | Senoko Energy Pte Ltd | 2025 |
| 40 | PUB Piping | Weld seam corrosion protection (training) | Soe & San Pte Ltd | 2025 |
| 39 | Senoko Energy | Painting works | Senoko Energy Pte Ltd | 2025 |
| 38 | Senoko Energy | Painting works | Senoko Energy Pte Ltd | 2025 |
| 37 | Neo Garden HQ | Bin centre renovation | Green Waste Technology Pte Ltd | 2025 |
| 36 | Senoko Energy | Painting works | Senoko Energy Pte Ltd | 2025 |
| 35 | Chapel Court | Condominium repair & redecoration | Supreme Contract Services Pte Ltd | 2025 |
| 34 | The Amery | Condominium repair & redecoration | LTC Coatings (S) Pte Ltd | 2025 |
| 33 | Palm Gardens | Condominium repair & redecoration | LTC Coatings (S) Pte Ltd | 2025 |
| 32 | Senoko Energy | Painting works | Senoko Energy Pte Ltd | 2025 |
| 31 | Grand Copthorne Waterfront Hotel | Lobby canopy chemical cleaning | Grand Copthorne Waterfront Hotel Singapore | 2025 |
| 30 | 13 Upper Circular Road | Building exterior waterproofing | Towner Construction Pte Ltd | 2025 |
| 29 | PacificLight Power | Station fuel gas piping painting | PacificLight Power Pte Ltd | 2025 |
| 28 | The Cathy @ Handy Road | Windows & structure painting, corrosion protection | Building Management | 2025 |
| 27 | SCMC Jurong Port | Steel structure corrosion protection & painting | AKILA Global Pte Ltd | 2025 |
| 26 | The Spring Field | Cluster house repair & redecoration | LTC Coatings (S) Pte Ltd | 2024 – 2025 |
| 25 | Senoko Energy | Painting works | Senoko Energy Pte Ltd | 2024 |
| 24 | Senoko Energy | Painting works | Senoko Energy Pte Ltd | 2024 |
| 23 | PacificLight Power | Station fire water piping & tanks painting | PacificLight Power Pte Ltd | 2024 |
| 22 | Neo Garden HQ | Building painting | Neo Garden Catering Pte Ltd | 2024 |
| 21 | Amgen Buildings | Façade & walkway shelter repainting | HB Resources Pte Ltd | 2024 |
| 20 | RWS Festive Walk Canopy | Painting | Vector Foiltec Pte Ltd | 2024 |
| 19 | The Sunny Spring | Condominium repair & redecoration | HB Resources Pte Ltd | 2024 |
| 18 | PacificLight Power | Transformer walls painting | PacificLight Power Pte Ltd | 2024 |
| 17 | Neo Garden HQ | Planter boxes waterproofing | Neo Garden Catering Pte Ltd | 2024 |
| 16 | Pan Pacific Serviced Suites Orchard | Lobby canopy chemical cleaning | Pan Pacific Group | 2024 |
| 15 | Illoura | Cluster houses repair & redecoration | HB Resources Pte Ltd | 2024 |
| 14 | Afton Jurong Island | Admin building interior renovation | Long Wei Construction & Engineering Works Pte Ltd | 2023 |
| 13 | Nottinghill Suites | Condominium repair & redecoration | MP Design & Contract Pte. Ltd. | 2024 |
| 12 | The Vision | Condominium repair & redecoration | SS Contract Services Pte Ltd | 2023 |
| 11 | Tuas Power Jurong Island | Admin building & transformer walls painting | China International Water & Electric Corp. (S) Pte Ltd | 2023 |
| 10 | LOGOS, 8 Jurong Pier Road | Building painting | Song Bee Construction Pte Ltd | 2023 |
| 9 | Linde Jurong Island | Cold box tower painting | China National Chemical Eng. (TCC) | 2023 |
| 8 | The Blossomvale | Condominium repair & redecoration | HB Resources Pte Ltd | 2023 |
| 7 | The Interlace | Condominium repair & redecoration | LTC Coatings (S) Pte Ltd | 2023 |
| 6 | Eight Courtyards | Condominium repair & redecoration | SS Contract Services Pte Ltd | 2023 |
| 5 | Afton Jurong Island | Admin building roof waterproofing | Long Wei Construction & Engineering Works Pte Ltd | 2023 |
| 4 | Beaverton Court | Condominium repair & redecoration | LTC Coatings (S) Pte Ltd | 2023 |
| 3 | FOC Sentosa Bar & Restaurant | Repair & redecoration | FOC Sentosa | 2022 |
| 2 | Hotel Bencoolen | Repair & redecoration | Seamaster Paint (S) Pte Ltd | 2022 |
| 1 | The Vesta | Condominium repair & redecoration | LTC Coatings (S) Pte Ltd | 2022 |